Waterborne Odorless 2 in 1 Interior Wall Paint
Technical Data
Ingredients | Water ,water-based deodorizing emulsion, environmental pigment,environmental additive |
Viscosity | 115Pa.s |
pH value | 7.5 |
Water resistance | 1000 times |
Theoretical coverage | 0.95 |
Drying time | Surface dry in 2 hours, hard dry in about 24 hours. |
Repainting time | 2 hours (based on dry film 30 microns, 25-30 ℃) |
Solid content | 58% |
Proportion | 1.3 |
Country of origin | Made in China |
Model NO. | BPR-1302 |
Physical state | white viscous liquid |
Product Features
• Bacteriostatic
• Mildewproof
Product Application
It is suitable for coating different substrates, such as interior walls and ceilings.
Product Construction
Application instructions
The surface must be clean, dry, neutral, flat, free of floating dust, oil stains and sundries, the leaking part must be sealed, and the surface must be polished and smoothed before painting to ensure that the surface humidity of the pre-coated substrate is less than 10%, and the pH value is less than 10.
The quality of the paint effect depends on the flatness of the base layer.
Application conditions
Please do not apply in wet or cold weather (the temperature is below 5°C and the relative degree is above 85%) or the expected coating effect will not be achieved.
Please use it in a well ventilated place. If you really need to work in a closed environment, you must install ventilation and use appropriate protective devices.
Tool Cleaning
Please use clean water to wash all utensils on time after stopping in the middle of painting and after painting.
Coating system and coating times
♦ Base surface treatment: remove dust, oil stains, cracks, etc. on the base surface, spray glue or interface agent to increase adhesion and alkali resistance.
♦ Putty scraping: Fill the uneven part of the wall with low alkaline putty, scrape twice horizontally and vertically alternately, and smooth it with sandpaper after scraping each time.
♦ Primer: Brush a layer with a special primer to increase coating strength and adhesion of the paint.
♦ Brush topcoat: according to the type and requirements of the paint, brush two to three topcoats, wait for drying between each layer, and refill putty and smooth.
Theoretical paint consumption
9.0-10 square meters/kg/single pass (dry film 30 microns), due to the roughness of the actual construction surface and the dilution ratio, the amount of paint consumption is also different.
Packaging specification
20KG
Storage method
Store in a cool and dry warehouse at 0°C-35°C, avoid rain and sun exposure, and strictly prevent frost. Avoid stacking too high.
Product construction steps
Product Display
Substrate Treatment
1. New wall: Thoroughly remove surface dust, oil stains, loose plaster, etc., and repair any holes to ensure that the wall surface is clean, dry and even.
2. Re-painting wall: Thoroughly remove the original paint film and putty layer, clean surface dust, and level, polish, clean and thoroughly dry the surface, so as to avoid problems left over from the old wall (odor, mildew, etc.) affecting the application effect.
*Before coating, the substrate should be checked; coating can only start after the substrate has passed acceptance inspection.
Precautions
1. Please work in a well-ventilated environment, and wear a protective mask when polishing the wall.
2. During construction, please configure necessary protective and labor protection products according to local operating regulations, such as protective glasses, gloves and professional spraying clothing.
3. If it gets into eyes accidentally, please rinse well with plenty of water and seek medical treatment immediately.
4. Do not pour the remaining paint liquid into the sewer to avoid clogging. When disposing of paint waste, please comply with local environmental protection standards.
5. This product must be sealed and stored in a cool and dry place at 0-40°C. Please refer to the label for details on production date, batch number and shelf life.