4

Products

Alkali-Resistant Sealing Primer Water-Based Emulsion of Exterior Wall Paint for Homedecor

Short Description:

This product adopts a new deodorizing technology to reduce the residual odor in the primer; it can effectively penetrate into the wall, providing excellent adhesion and super sealing. Use with Popar’s wall paints products to ensure a brighter and better coating film and create a comfortable, healthy and beautiful home environment.

Acceptance: OEM/ODM, Trade, Wholesale, Regional Agency
Payment: T/T, L/C, PayPal
Our service: We have our own factory in China. Among many trading companies, we are your best choice and your absolutely reliable business partner.

Any inquiries we are happy to reply, pls send your questions and orders.
Stock Sample is Free & Available


Product Detail

Product Tags

Product Parameter

Packaging specification 20 kg  /bucket
Model NO. BPR-8001
Brand Popar
Level Primer
Substrate Brick/Concrete/Putty/Primer
Main raw material Acrylic
Drying method Air drying
Packaging mode Plastic bucket
Application Widely used for exterior decoration of schools, hospitals, villas, high-end residences and high-end hotels.
Features Good alkali resistance, strong filling. Good whole effect of construction .High hiding power can save the amount of topcoat
Acceptance  OEM/ODM, Trade, Wholesale, Regional Agency
Payment method T/T, L/C, PayPal
Certificate ISO14001, ISO9001, French VOC a+ certification
Physical state Liquid
Country of origin Made in China
Production capacity 250000 Ton/Year
Application method Brush / Roller / Spray guns
MOQ ≥20000.00 CYN  (Min. Order)
Solid content 52%
pH value 8
Shelf life 2 years
Color White
HS Code 320990100

Product Description

Selects high-quality raw materials, does not add fragrance, and adopts advanced production technology to make the home natural, pure, environmentally friendly and comfortable.

Product Features

Fresh smell, healthy and environmentally friendly.

Efficient anti-alkali, can prevent latex paint from being damaged by the alkaline substance of the substrate.

Reinforce the base layer and enhance the adhesion of the intermediate coating.

It can save the amount of topcoat and improve the fullness of the paint film.

Product Application

vav (1)
vav (2)

Direction For Use

Application instructions: The surface must be clean, dry, neutral, flat, and free of floating ash, oil stains and foreign matters. Water-leaking positions must undergo waterproof treatment. Before coating, the surface should be polished and leveled to ensure that the surface humidity of the pre-coated substrate is <10% and the pH value is

Application conditions: Wall temperature ≥ 5 ℃, humidity ≤ 85%, and good ventilation.

Application methods: Brush coating, roller coating and spraying.

Dilution ratio: Dilute with a proper amount of clear water (to the extent of being suitable for pasting) Water to paint ratio 0.2:1 . Remember mixing well before using .

Theoretical paint consumption: 4-5㎡/Kg (two times of roller coating); 2-3㎡/Kg (two times of spraying). (The actual amount varies slightly due to the roughness and looseness of the base layer),

Recoating time: 30-60 minutes after surface drying, 2 hours after hard drying, and recoating interval is 2-3 hours (which may be duly extended under low-temperature and high-humidity conditions).

Maintenance time: 7 days/25℃, which may be duly extended under low-temperature and high-humidity conditions to obtain a solid film effect. In the process of paint film maintenance and daily use, it is suggested that doors and windows should be closed for dehumidification in high humidity weather (such as Wet Spring and Plum Rain).

Tool Cleaning: After or between applications, please clean the tools with clean water in time in order to prolong tool life. The packaging bucket can be recycled after cleaning, and packaging waste may be recycled for reuse.

Substrate Treatment

1. New wall: Thoroughly remove surface dust, oil stains, loose plaster, etc., and repair any holes to ensure that the wall surface is clean, dry and even.

2. Re-painting wall: Thoroughly remove the original paint film and putty layer, clean surface dust, and level, polish, clean and thoroughly dry the surface, so as to avoid problems left over from the old wall (odor, mildew, etc.) affecting the application effect.
*Before coating, the substrate should be checked; coating can only start after the substrate has passed acceptance inspection.

Precautions

1. Please work in a well-ventilated environment, and wear a protective mask when polishing the wall.

2. During construction, please configure necessary protective and labor protection products according to local operating regulations, such as protective glasses, gloves and professional spraying clothing.

3. If it gets into eyes accidentally, please rinse well with plenty of water and seek medical treatment immediately.

4. Do not pour the remaining paint liquid into the sewer to avoid clogging. When disposing of paint waste, please comply with local environmental protection standards.

5. This product must be sealed and stored in a cool and dry place at 0-40°C. Please refer to the label for details on production date, batch number and shelf life.

Product construction steps

install

Product Display

avavb (2)
avavb (1)

  • Previous:
  • Next: